Installation guide

A general overview of how cabinets go in, so you know what to expect from your installer.

General guidance
  1. Check the delivery against the order

    Before any cabinet is fastened, every piece should be unpacked, checked against the order and inspected for damage.

  2. Find the high point and set a level line

    Floors are rarely level. Installers usually find the highest point of the floor and work from a level reference line around the room.

  3. Locate the wall structure

    Cabinets are fastened to the building structure, not to drywall alone. How and where is your installer’s decision, based on your walls and local code.

  4. Wall cabinets, then base cabinets (or the reverse)

    Installers differ on the order. Cabinets are shimmed plumb and level and joined to each other so faces line up.

  5. Fillers, panels and trim

    Fillers close gaps at walls and appliances, then toe kicks, panels and crown are scribed and fitted.

  6. Countertop template

    Countertops are usually templated after base cabinets are set and level.

  7. Doors, drawers and hardware

    Doors and drawer fronts are aligned last. See the door adjustment notes in the care guide for settling after install.

Your installer and order documents come first.Fastener types, wall and anchoring requirements, clearances and any product-specific instructions come from your installer, local code and the documents supplied with your SEKCÉ order. This page does not replace them.